Project name: TRUNG NAM WIND POWER PLANT
Investor: Trung Nam Wind Power Joint Stock Company
Scale:
Total capacity: 151.95 MW, divided into 03 phases.
- - Phase 1: 39.95 MW (17 turbines, 2.35 MW each)
- - Phase 2: 64 MW (16 turbines, 4 MW each)
- - Phase 3: 48 MW (12 turbines, 4 MW each)
Location: Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
Commencement: 26/08/2016
Inauguration: 16/04/2021