TRUNGNAM WIND FARM

Project: TRUNGNAM WIND FARM

Investor: Trungnam Wind Power

Scale:
Capacity: 151,95MW, with 02 phases.

  • Phases 1: 39,95MW (17 turbines, 2,35MW)
  • Phases 2: 64MW (16 turbines, 4MW
  • Phases 3: 48MW (12 turbines, 4MW)

Location: Loi Hai and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province 

Start: 26/08/2016

Complete: 16/04/2021

TOP