The Khanh Hoa – Buon Ma Thuot Expressway (CT.24) spans a total length of 117.5 km with a 4-lane design. The project shortens travel time between the two provinces from nearly 200 km down to approximately 117 km.
Project details:
Starting point: Junction of National Highway 26B and National Highway 1, near Nam Van Phong Port area (Ninh Hoa town, Khanh Hoa Province).
Ending point: Intersection at Km12+450 on the Ho Chi Minh Road, eastern bypass of Buon Ma Thuot City (Dak Lak Province).
Design speed: 80 - 100 km/h.
Total investment: Approximately VND 22,000 billion