index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1

BIEN HOA - VUNG TAU EXPRESSWAY

Bien Hoa – Vung Tau Expressway (Phase 1) features Trungnam E&C (a member of Trungnam) as the key construction contractor for Component Project 1.

Total route length: Nearly 54 km starting from the National Highway 1 intersection (Bien Hoa City, Dong Nai) to the interchange connecting to the coastal city of Vung Tau.

Scope of work: Trungnam E&C leads the construction consortium for Bidding Package No. 18 (contract value of VND 1,479 billion), covering the section from Km0+000 to Km6+200.

Core construction items: Undertaking major critical construction fronts, including soft soil treatment, roadbed embankment, hot-mix asphalt concrete paving, drainage culvert systems, and cross-route overpasses.

Total investment: The entire route is estimated at nearly VND 17,800 billion, divided into 3 component projects for independent implementation. Specifically, Component Project 1 (a 16 km section through Dong Nai Province) has a total investment of over VND 6,000 billion, invested by the People's Committee of Dong Nai Province.

Infrastructure significance: The expressway plays a strategic role in directly relieving traffic pressure on National Highway 51. This arterial route seamlessly connects Long Thanh International Airport and the Cai Mep – Thi Vai deep-water port cluster, driving industrial and logistics growth in the Southeast region.

TOP