index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1

MY THUAN 2 BRIDGE

My Thuan 2 Bridge is a strategic cable-stayed bridge connecting the former Tien Giang and Vinh Long provinces. Located on the North – South Expressway, the project marks a major milestone as the first large-scale cable-stayed bridge entirely designed and constructed by Vietnamese engineers and workers.

Core technical specifications:

Location: Approximately 350 m upstream from the existing My Thuan Bridge.

Total route length: 6.61 km (of which the main bridge is approximately 1.9 km long and the approach roads at both ends are 4.7 km long).

Bridge deck width: 28 m.

Design scale: 6 lanes, with a design speed of 80 km/h.

Main span and pylons: Cable-stayed main span with a 350 m span length, navigation clearance of 37.5 m, and 2 pylons standing 125 m high.

Investment budget: Over VND 5,000 billion.

Groundbreaking date: February 27, 2020.

Full-route traffic opening date: December 24, 2023.

TOP