My Thuan 2 Bridge is a strategic cable-stayed bridge connecting the former Tien Giang and Vinh Long provinces. Located on the North – South Expressway, the project marks a major milestone as the first large-scale cable-stayed bridge entirely designed and constructed by Vietnamese engineers and workers.
Core technical specifications:
Location: Approximately 350 m upstream from the existing My Thuan Bridge.
Total route length: 6.61 km (of which the main bridge is approximately 1.9 km long and the approach roads at both ends are 4.7 km long).
Bridge deck width: 28 m.
Design scale: 6 lanes, with a design speed of 80 km/h.
Main span and pylons: Cable-stayed main span with a 350 m span length, navigation clearance of 37.5 m, and 2 pylons standing 125 m high.
Investment budget: Over VND 5,000 billion.
Groundbreaking date: February 27, 2020.
Full-route traffic opening date: December 24, 2023.