BACH DANG BRIDGE

Bach Dang Bridge was built to complete the route connecting Ha Long City with the Hanoi – Hai Phong expressway system and to connect the economic triangle of Hanoi – Hai Phong – Quang Ninh.

Investors: Trungnam Group – SE Corp. – CIENCO 1 – Cuong Thinh Thi – Cai Mep – Phuc Loc – Cong Thanh – Phuong Thanh

Scale:

  • - Permanent construction using reinforced concrete and prestressed reinforced concrete
  • - Main bridge length: 3.054 km; width: 25 m; designed for 4 lanes; maximum speed: 100 km/h
  • - Navigation clearance: 250 m wide, 48.4 m high; designed to withstand Level VIII earthquakes
  • - The bridge has 3 pylons; approach roads on both sides total 2.357 km

Investment form: BOT

Location: Hai Phong City and Quang Ninh Province

Commencement: 25/02/2015

Inauguration: 01/09/2018