HUE INTERSECTION GRADE-SEPARATED INTERCHANGE

Project name: HUE INTERSECTION GRADE-SEPARATED INTERCHANGE

Investor: Trungnam BT NBH

Scale:
The interchange has 3 levels:

  • - Ground level: for the railway lines passing through and road turning branches that do not intersect the railway
  • - Level 2: an elevated roundabout with a width of 15 m, with 4 lanes, and turning branches with widths of 8 m and 16 m\
  • - Level 3: running in the direction from Hue to Da Nang city center and vice versa, 17 m wide with 4 lanes

Span arrangement: Span Unit 1 (2×30 + 2×35 + 30) m + Cable-stayed section (2×90) m + Span Unit 2 (30 + 35 + 5×30) m

Location: the intersection of National Highway 1A with the main road leading into Da Nang city center and the North–South railway line

Commencement: 28/09/2013

Inauguration: 29/03/2015

TOP