Rach Mieu 2 Bridge opens a new transport corridor for the entire Mekong Delta region. Goods move faster. Logistics costs drop. Businesses gain easier access to markets. Tourism, agriculture, and seafood industries all get a powerful boost.
Project information:
Capital: 6.810 Billion VND
Total length: 17,6 km
Main bridge length: ~2km; designed for 4 lanes;
Location: Connecting Dong Thap Province with Vinh Long Province
Commencement: 2022 March
Inauguration: 2025 August