SUCCESSFUL ENERGIZATION OF 500KV SUBSTATION AT EA NAM WIND POWER PLANT

At 00:05 on August 17, 2021, Ea Nam Substation under the Ea Nam Wind Power Plant project successfully energized its 500kV transformers. Previously, on August 13, the project successfully energized the 1.2 km double-circuit 500kV Di Linh – Pleiku transmission line branch into Ea Nam Substation. The substation is equipped with 02 500 kV/225 MVA power transformers designed and manufactured by SIEMENS—the world's leading electrical equipment manufacturer from Germany. Total capacity of the 02 transformers reaches 450 MVA.
The 225 MVA power transformer is the project's most critical component, serving as the “heart” of this renewable energy project by stepping up and stepping down voltage to ensure alignment with grid power consumption needs. Meanwhile, the 1.2 km double-circuit 500kV connection line loops directly from Ea Nam Wind Power Plant into the existing Pleiku – Di Linh 500kV transmission line.

1. EA NAM WIND POWER PLANT & TRANSMISSION SYSTEM INFORMATION


 

CATEGORY

SPECIFICATIONS

A

WIND POWER PLANT SECTION

1

Total Capacity

400 MW

2

Operational Lifespan

 

3

Wind Towers & Turbines

84 towers including: 48 4.2 MW turbines, 36 5.5 MW turbines

4

Groundbreaking Date

 

5

Expected Power Output

1.1 billion kWh/year

6

Total Investment Capital

VND 16,500 billion

7

Workforce

1,000 workers, engineers, and foreign experts

8

Land Area

6,000 hectares (spanning Ea Nam, Ea Khal, and Dlie Yang communes)

 

CATEGORY

PARAMETERS

SPECIFICATIONS

 

TRANSMISSION LINE AND SYSTEM SECTION

 

 

33/500kV Substation

 

02 units

Siemens Energy – Germany

Total capacity 450 MVA

 

500kV double-circuit transmission line

(4xACSR 330)

 

Connection point: Loop connection into existing Pleiku – Di Linh 500kV line

 

1.2 km

From Ea Nam Wind Power Plant looped into the existing Pleiku – Di Linh line.

 


2. TECHNICAL SPECIFICATIONS OF THE 500 kV/225 MVA TRANSFORMER


 

POWER TRANSFORMER

500 kV / 225 MVA

 

3-PHASE

Capacity

225 MVA

Length

12.76 m

Width

6.1 m

Height

10.2 m

Dry Weight

167 tons

Total Weight

(with cooling oil)

250 tons



The 400 MW Ea Nam Wind Power Plant Project combined with the 450MVA/500kV Substation and transmission line , beyond looping into the 500kV Pleiku – Di Linh transmission line, will become Vietnam's largest operational wind power plant upon completion. Upon completion, the project is expected to add approximately 1,173.6 GWh annually to the national power grid; over its operational lifetime, the investor is estimated to contribute over VND 3,000 billion in Corporate Income Tax (CIT) to local budget revenue and pay approximately VND 250 billion/year in Value Added Tax (VAT).

The Ea Nam Wind Power Plant Project going into operation will play a pivotal role in reducing air pollution and greenhouse gas emissions, creating employment for hundreds of local workers, and making substantial contributions to the province's socio-economic development in the coming period.
500kV Ea Nam Substation transformer energization - Trungnam Group Overview of Ea Nam 500kV substation and wind power plant - Trungnam Group 500kV transmission line towers at Ea Nam Wind Farm - Trungnam Group Siemens 500kV transformer at Ea Nam Substation - Trungnam Group Ea Nam wind turbine installation and electrical infrastructure - Trungnam Group Engineers inspecting 500kV substation equipment at Ea Nam project - Trungnam Group Control center and transmission systems at Ea Nam Wind Power Plant - Trungnam Group High-voltage electrical switchyard at Ea Nam 500kV Substation - Trungnam Group