At 00:05 on August 17, 2021, Ea Nam Substation under the Ea Nam Wind Power Plant project successfully energized its 500kV transformers. Previously, on August 13, the project successfully energized the 1.2 km double-circuit 500kV Di Linh – Pleiku transmission line branch into Ea Nam Substation.
The substation is equipped with 02 500 kV/225 MVA power transformers designed and manufactured by SIEMENS—the world's leading electrical equipment manufacturer from Germany. Total capacity of the 02 transformers reaches 450 MVA.
The 225 MVA power transformer is the project's most critical component, serving as the
“heart” of this renewable energy project by stepping up and stepping down voltage to ensure alignment with grid power consumption needs. Meanwhile, the 1.2 km double-circuit 500kV connection line loops directly from Ea Nam Wind Power Plant into the existing Pleiku – Di Linh 500kV transmission line.
1. EA NAM WIND POWER PLANT & TRANSMISSION SYSTEM INFORMATION
|
|
CATEGORY
|
SPECIFICATIONS
|
|
A
|
WIND POWER PLANT SECTION
|
|
1
|
Total Capacity
|
400 MW
|
|
2
|
Operational Lifespan
|
|
|
3
|
Wind Towers & Turbines
|
84 towers including: 48 4.2 MW turbines, 36 5.5 MW turbines
|
|
4
|
Groundbreaking Date
|
|
|
5
|
Expected Power Output
|
1.1 billion kWh/year
|
|
6
|
Total Investment Capital
|
VND 16,500 billion
|
|
7
|
Workforce
|
1,000 workers, engineers, and foreign experts
|
|
8
|
Land Area
|
6,000 hectares (spanning Ea Nam, Ea Khal, and Dlie Yang communes)
|
|
|
CATEGORY
|
PARAMETERS
|
SPECIFICATIONS
|
|
|
TRANSMISSION LINE AND SYSTEM SECTION
|
|
|
33/500kV Substation
|
02 units
|
Siemens Energy – Germany
Total capacity 450 MVA
|
|
|
500kV double-circuit transmission line
(4xACSR 330)
|
|
Connection point: Loop connection into existing Pleiku – Di Linh 500kV line
|
|
|
1.2 km
|
From Ea Nam Wind Power Plant looped into the existing Pleiku – Di Linh line.
|
|
|
|
|
|
2. TECHNICAL SPECIFICATIONS OF THE 500 kV/225 MVA TRANSFORMER
|
|
POWER TRANSFORMER
500 kV / 225 MVA
|
|
|
3-PHASE
|
|
Capacity
|
225 MVA
|
|
Length
|
12.76 m
|
|
Width
|
6.1 m
|
|
Height
|
10.2 m
|
|
Dry Weight
|
167 tons
|
|
Total Weight
(with cooling oil)
|
250 tons
|
The 400 MW Ea Nam Wind Power Plant Project combined with the 450MVA/500kV Substation and transmission line , beyond looping into the 500kV Pleiku – Di Linh transmission line, will become Vietnam's largest operational wind power plant upon completion. Upon completion, the project is expected to add approximately 1,173.6 GWh annually to the national power grid; over its operational lifetime, the investor is estimated to contribute over VND 3,000 billion in Corporate Income Tax (CIT) to local budget revenue and pay approximately VND 250 billion/year in Value Added Tax (VAT).
The Ea Nam Wind Power Plant Project going into operation will play a pivotal role in reducing air pollution and greenhouse gas emissions, creating employment for hundreds of local workers, and making substantial contributions to the province's socio-economic development in the coming period.